Residential Hampstead, 2024
Project Overview

Hampstead Manor, Georgian Restoration

A sensitive full restoration of a Grade II listed Georgian terrace in Hampstead, paired with a contemporary two-storey rear extension. We delivered a respectful return to period detail at the front, with a confidently modern living wing behind it.

Scope of Works

  • Full structural restoration of the listed shell
  • Two-storey rear extension in glass and zinc
  • Reinstated period plasterwork, cornicing and joinery
  • New bespoke kitchen, primary bathroom and dressing room
  • Ground source heat pump and full M&E re-fit
  • Landscaped rear garden with stone terrace
Client
Private client
Location
Hampstead, NW3 London
Project Value
£1.8 Million
Duration
14 Months
Floor Area
850 m2
Team Size
22 Trades
Completed
November 2024
The Challenge

Working inside a Grade II listed Georgian shell on a tight North London street, the project had to satisfy heritage officers, the conservation area panel and a young family with a clear contemporary brief. Structural stability of the front parapet, party wall agreements and an unexpected basement water table all needed to be solved before the rear extension could even start.

Our Solution

We programmed the heritage restoration and modern extension as two parallel work streams under a single site management team. Period craftsmen handled the plaster, joinery and stucco at the front, while a separate steel and zinc team built the rear wing. The result is a home that reads as period from the street and as contemporary architecture from the garden, delivered on programme to a Private client.

Project Gallery

Build In Pictures

Build Process

Key Milestones

01
Foundation Phase

Groundwork, drainage, and concrete foundations completed in 6 weeks.

02
Structural Frame

Steel and timber-frame hybrid structure raised in 9 weeks. Roof watertight by Christmas.

03
Internal Fit-out

Hand-finished joinery, bespoke kitchen, and natural stone work over 5 months of detailed craft.

04
Handover

Snagging, commissioning of M&E systems, and full handover delivered 2 weeks ahead of schedule.